Ethics Commissioner
8 (7172) 78-68-88
Phone of the Office
8 (7172) 78-69-81
AOR carries out a plan for the production of petroleum products

Atyrau refinery in 2016 successfully fulfilled the production program.

Following 11 months of crude oil refining totaled 4,310,823 tons, i.e. 100% of the targets. At the same time over the plan AOR processed 27.5 thousand tons of oil.

Implementation of the annual plan is expected in the amount of:

- For motor gasoline – 587,1 thousand tons by 16 December;

- For diesel fuel – 1 370,3 thousand tons by 29 December;

- For vacuum gas oil - 808, 1 thousand tons to 22 December.

On December 12, 2016 is made from the plan: the production of jet fuel (116%), heating oil (100.2%), benzene (125.6%), liquefied natural gas (113.5%), sulfur (124.3%).

In addition, until the end of the year will be produced:

- Mobile gasoline cars – 32 thousand tons;

- diesel fuel - 1.5 thousand tons;

- liquefied gas - 7.1 thousand tons.

Top